Tuesday, 29 January 2013
Monday, 28 January 2013
Masterplan (Part Site)
My final masterplan document covers only part of the site. This is to allow for the extra space the site now fills with the removal of the ugly AXA building to the North. The masterplan has also been rotated by 90 degrees for a better fit on the page.
Masterplan (Full Site)
Below is my submitted Masterplan for the entire Calverley Grounds site, re-named Burton Park after Decimus himself.
The Hanging... feels like the rope is getting tighter...
After working through the night, literally through the night (into bed at 05:59 up at 06:30), last Sunday/Monday to get everything completed, then driving all the way to Greenwich, our scheduled hanging was cancelled due to the weather! I set my fastest time to Uni, then beat it on the way back! Must have been worse everywhere else...
After that I refused to let myself keep going back over the drawings and moved on to the A3 Document. This morning the re-scheduled hanging is taking place, and my work is up and being marked as I type. Fingers crossed...
There are areas I know need work on and I'm sure Jamie will pick up on them too, but hopefully it's all good enough.
After that I refused to let myself keep going back over the drawings and moved on to the A3 Document. This morning the re-scheduled hanging is taking place, and my work is up and being marked as I type. Fingers crossed...
There are areas I know need work on and I'm sure Jamie will pick up on them too, but hopefully it's all good enough.
Subscribe to:
Posts (Atom)